Tap Fees
Tap fees are collected on any new construction or remodel within the District’s boundaries.
Tap fees are based on the square footage of the floor area, plus any additional toilet, tub/shower, kitchen, hot tub, etc.
Payment of tap fees are required before the Town of Mt Crested Butte will issues a building permit.
Please submit a tap fee application with a $150.00 check and a complete set of stamped architectural plans for a tap fee final determination (Application fee and tap fee must be remitted by check; no cards accepted for Tap Fees).
Plans and payments can be emailed to info@mcbwsd.com or mailed to:
PO Box 5740 Mt Crested Butte, CO 81225-5740.
A locked drop box is also available for payments at 100 Gothic Road in Mt Crested Butte, CO.
The District does not estimate tap fees by any means without the submission of an application, fee and complete plans due to the liability and time involved.
View the 2024 Tap Fee Rate ScheduleView the Tap Fee Application
(PLEASE NOTE: Tap fee processing time is 14 days. PLAN AHEAD and note digging moratorium October 15 to April 15)
Water and Wastewater service line inspection forms are required to be completed during construction.
Water Service Line Inspection FormWastewater Service Line Inspection Form
Tap Fee Applications accepted all year, but...
NO Tapping/Digging/Inspections
Between October 15 and April 15 annually.
NO Exceptions!